ADRA Ukraine is performing repairs of the water pipeline and the water tower in Odesa Region with the support of the Church of Jesus Christ of Latter-Day Saints
ADRA Ukraine is performing repairs of the water pipeline and the water tower in Odesa Region with the support of the Church of Jesus Christ of Latter-Day Saints
Repairs of the water pipeline and the water supply tower in Fedorivka, Odesa Region, is ongoing as part of the LDS project supported by the Church of Jesus Christ of Latter-Day Saints. The village population is 150 households, and the access to water is the urgent need among the villagers. Currently, the water supply pipe routing works are in progress. On July 12th, ADRA Ukraine engineers travelled on site to conduct technical supervision, verify the pipe routing depth and check the connection point and feed lines to the households.
The next step according to the design plan is to install concrete turnarounds for the water pipeline in Fedorivka. Meanwhile, repair welding works are in progress at the water tower site, and foundation laying is upcoming.
Tags
Share this publication
Our social networks
Categories
Last news
Psychological and legal consultations for people throughout Ukraine and assistance with heating for 150 IDPs in Zaporizhzhia region — will combine such areas with the new ADRA Ukraine project, which started in ...
On September 23, an incident with an FPV drone occurred in the village of Zolochiv, Kharkiv region, during the distribution of food aid. Due to the team noticing the danger in time ...






